Maintain technical debt as a decision register
Debt items carry evidence, affected outcomes, risk, recurrence, remediation shape, and accountable owner.
The problem
Technical debt is discussed anecdotally, so urgency and business impact are impossible to compare.
What you get
A working system with the steps, tools, checkpoints, and expected return made explicit.
- Setup
- 75 minutes
- Back each week
- 3 hours
- Difficulty
- assisted
Expected return
The working case
A planning estimate, not a guaranteed result. Measure the first four weeks against your own baseline.
144
hours returned per year
At 3 hours/week across 48 working weeks.
1
week to earn back setup
Compare the setup estimate with the weekly time returned.
Operating contract
Input
The source material, constraints, and examples a human would need to do this work well.
Checkpoint
A person reviews judgment calls, sensitive content, unfamiliar tools, and irreversible actions.
Success signal
Track time returned, corrections required, and exceptions. Keep it only if the measured result compounds.
Before you start
- ·A named engineering lead
- ·An approved source-of-truth and review template
The steps
- 01
Name engineering lead as the accountable owner and define the decision this workflow is allowed to support.
- 02
Collect incidents, delivery friction, code ownership, and engineering estimates; preserve source links, timestamps, and access controls before any synthesis.
- 03
Produce a comparable technical-debt register using the approved template. Do not manufacture effort estimates or prioritize without engineering review.
Copy this prompt
Create a comparable technical-debt register from the supplied evidence. Separate facts, assumptions, and missing inputs. Cite every material claim. Do not manufacture effort estimates or prioritize without engineering review. Evidence: [approved inputs]
- 04
engineering lead reviews the draft, records the decision or next action, and corrects the source system before distribution.
What it runs on
Where this goes wrong
- Do not let the model act beyond do not manufacture effort estimates or prioritize without engineering review.
- Keep sensitive fields out of unapproved tools and retain a human-readable evidence trail.
Definition of done
Run it for four weeks. Then make it earn its place.
- □ Baseline the manual time before launch.
- □ Keep a human approval step for consequential output.
- □ Record corrections and exceptions, not just successes.
- □ Expand, revise, or retire it after the first review.